Construction of infrastructure facility: “Ground protection of Komsomolsk-on-Amur”.
Construction of Substation 220 kV Sukhoy Log of transformer capacity 126 MWA for Branch of UES FGS PAO (JSC) – Main Power Networks of Siberia (MES Sibiri))
Package of electrical installation works during the reconstruction of Power Unit No. 9 of CHP Plant-22 – Branch of Mosenergo PAO (JSC) for the Customer – TER OOO (Ltd.) Energokomplekt will provide the supply of electrical materials, cabling and wiring products and lighting devices.
Construction of two double-circuit HV-lines 220 kV Sukhoy Log-Mamakan, appr. length: 169.9 km each for Branch of UES FGS PAO (JSC) – Main Power Networks of Siberia (MES Sibiri)
Construction of one-circuit HV-line 220 kV Peledui – Sukhoy Log, appr. length: 248 km for Branch of UES FGS PAO (JSC) – Main Power Networks of Siberia (MES Sibiri))
Construction of Byelorusskaya NPP. Power Unit No. 2.
Replacement of cable lines 35 kV providing electricity supply for the steel-melting arc-furnace of the electric furnace melting shop for NLMK АО (JSC)
Construction of Substation 110/35/10 kV CGP-Sever of Novy Port oil-and-gas condensate field for Gazpromneft-Yamal ООО (Ltd.)
Energokomplekt has completed the supply of materials for the OHTL “Minusinskaya master station - Kamala-1”
Energokomplekt OOO (Ltd.) continues to supply materials for the construction of the Oznachennoe - Stepnaya overhead transmission line
Energokomplekt OOO (Ltd.) continues to supply materials for the construction of the Naldinskaya substation 220 kV
All news