Comprehensive upgrading and retooling of Substation 500/220/110 kV Beskudnikovo for Branch of UES FGS PAO (JSC) – Main Power Networks of the Centre (MES Centra)
Construction of a new facility for the production of DOTP wih a capacity of 100 thousand tons per annum on the premises of Sibur-Khimprom АО (JSC)
OHTL 500 kV Rostovskaya NPP – Tikhoretskaya No. 2 with the expansion of Substation 500 kV Tikhoretskaya. (L=357 279 km) for Branch of UES FGS PAO (JSC) – Main Power Networks of the South (MES Yuga)
Construction of OHTL 220 kV Selikhino -Vanino for Branch of UES FGS PAO (JSC) – Main Power Networks of the East (MES Vostoka)
Expansion of Substation 220 kV Vanino for Branch of UES FGS PAO (JSC) – Main Power Networks of the East (MES Vostoka)
Energokomplekt ООО accomplished the delivery of materials for the construction of OHTL 110 kV in the process of connection of Substation 110 kV of Kamenskaya wind-power station and Sulinskaya WPP to the electric power networks.
OHTL 750 kV Leningradskaya – Belozerskaya (the line section inside the territory of Leningrad Region and Vologda region) (L=245.5 km) for Branch of UES FGS PAO (JSC) – Main Power Networks of the North-West (MES Centra)
OHTL 750 kV Leningradskaya – Belozerskaya (the line section inside the territory of Leningrad Region) for Branch of UES FGS PAO (JSC) – Main Power Networks of the North-West (MES Severo-Zapada)
OHTL 220 kV Komsomolskaya-Selikhino for Branch of UES FGS PAO (JSC) – Main Power Networks of the East (MES Vostoka)
Expansion of Substation 500 kV Rostovskaya (Taman) by three bays for Branch of UES FGS PAO (JSC) – Main Power Networks of the South (MES Yuga)
Construction of OHTL 500 kV Rostovskaya – Andreevskaya – Vyshesteblievskaya (Taman) for Branch of UES FGS PAO (JSC) – Main Power Networks of the South (MES Yuga)
Reconstruction of MSDS-220 (step-down substation) on the premises of Gazpromneft-ONPZ АО (JSC)
Comprehensive upgrading and reconstruction of Substation 220 kV Levoberezhnaya for Branch of UES FGS PAO (JSC) – Main Power Networks of Siberia (MES Sibiri)
Electrification of Uzbekistan Railway Roads: the construction of tracking substations – Substation 110 kV Raz’ezd No. 4 and Substation 220 kV Sardala
Construction of Substation 220 kV Zvezda with OHTL 220 kV approaching lines Beregovaya-2 – Pereval for Branch of UES FGS PAO (JSC) – Main Power Networks of the East (MES Vostoka)
Construction of Substation 500 kV Taman for Branch of UES FGS PAO (JSC) – Main Power Networks of the South (MES Yuga)
Comprehensive reconstruction of Substation 500 kV Tavricheskaya for Branch of UES FGS PAO (JSC) – Main Power Networks of Siberia (MES Sibiri)
Energokomplekt has completed the supply of materials for the OHTL “Minusinskaya master station - Kamala-1”
Energokomplekt OOO (Ltd.) continues to supply materials for the construction of the Oznachennoe - Stepnaya overhead transmission line
Energokomplekt OOO (Ltd.) continues to supply materials for the construction of the Naldinskaya substation 220 kV
All news