Main / Our projects / Construction of Substation 220 kV Sukhoy Log of transformer capacity 126 MWA for Branch of UES FGS PAO (JSC) – Main Power Networks of Siberia (MES Sibiri))

Energokomplekt ООО carries out the delivery of substation equipment and supplies materials and steel structures for the construction of high-voltage electricity transmission lines. The most up-to-date power and switching equipment for the above electricity transmission lines operated by automated control systems, were delivered to the substation.

  Engineering and packaged supply of substation equipment:
Major electrical equipment
Foundations
Relay protection and automation systems, Automated process control systems, Communications systems, Electric power fiscal metering systems
Cabling and wiring products
Modular constructions
Quickly erectable structures
Training of the operating personnel

  The Customer: Elektrouralmontazh АО (JSC) – under contract with Branch of UES FGS PAO (JSC)– Main Power Networks of Siberia (MES Sibiri)

  Commencement of delivery: April. 2018

  Completion of delivery: 30 October, 2020

  Amount of contract: RUB 596 million.