Main / Our projects / Construction of two double-circuit HV-lines 220 kV Sukhoy Log-Mamakan, appr. length: 169.9 km each for Branch of UES FGS PAO (JSC) – Main Power Networks of Siberia (MES Sibiri)
Energokomplekt carries out the delivery of substation equipment and supplies materials and steel structures for the construction of high-voltage electricity transmission lines.
Engineering and packaged supply of materials and equipment for HV-lines:
Foundations
Towers
Steel structures
Conductors, ground wire
FOCL
Line fittings and accessories
The Customer: Ural Power Engineering Construction Company АО (JSC) under contract with Branch of UES FGS PAO (JSC)– Main Power Networks of Siberia (MES Sibiri)
Commencement of delivery: April, 2018.
Completion of delivery: 30 October, 2020.
Amount of contract: RUB 164 million.
News and events
All news