Main / Our projects / Expansion of Substation 500 kV Rostovskaya (Taman) by three bays for Branch of UES FGS PAO (JSC) – Main Power Networks of the South (MES Yuga)

  Engineering and packaged supply on a “turn-key” basis:
High-voltage circuit-breakers 500 kV (Siemens AG)
Instrument current transformers (Tranch Group).
Reactor equipment (Tranch Group).
Disconnecting devices 500 kV
Cabling and wiring products
Modular constructions
Relay protection and automation systems, Automated process control systems, Communications systems, Electric power fiscal metering systems

  The Customer: Elektrouralmontazh AO (JSC) under contract with UES FGS PAO (JSC) – Main Power Networks of the South (MES Yuga)

  Commencement of delivery: May, 2017

  Completion of delivery: December, 2017

  Amount of contract: RUB 657 million.